Waeco Construction
  • (360) 794-7785
  • Services
    • Civil Construction
    • OSP Construction
    • Engineering
    • Trenchless Pipe Repair
    • Topsoil
  • Industries
    • Telecom
    • Civil Construction
    • Residential
  • Projects
  • About
  • Contact
  • Quote
  • Blog
  • Services
    • Civil Construction
    • OSP Construction
    • Engineering
    • Trenchless Pipe Repair
    • Topsoil
  • Industries
    • Telecom
    • Civil Construction
    • Residential
  • Projects
  • About
  • Contact
  • Quote
  • Blog
  • (360) 794-7785

Point Defiance Bypass

Joint fiber optic relocation project approx 2.5miles 
of an 11 mile project along railroad frontage
Project Details

Services Rendered

​Underground conduit placement, Fiber optic cable placement, Fiber optic splicing (including LEAF fiber)

Relevant Products Used

​Trackhoe(s), Directional Drill(s) Cable blowing machine, Cable pulling machine Installed 2000'  of 12”  casing via directional bore beneath I-5 total package of duct was (12) 1.25” ducts. JBLM road crossing

Location

Dupont, WA

Subs Used

​Fiber Guys, RBC, Zero Db

Architect

MGC Technical

Size

​2.5 miles of approx 11 mile total project

Date

2015
digging trench for cables
tractors lined up
train tracks
working in trench
covered trench
digging trench for cables

Services

Projects

About

Quote

Contact

Blog

(360) 794-7785


Waeco logo
Waeco construction logo
Waeco engineering logo
Waeco topsoil & recycle logo
Web Design & Search Optimization by Inquisitek